Our yard is in Fullerton, and a crew reaches Villa Park down the 57, the 91 and the 55, off at Katella Avenue, which turns into Villa Park Road at the city line. It is a 25 minute run, so we plan a Villa Park week rather than a Villa Park day. The city was incorporated in 1962 to stay a town of big single family lots, and it did. Permits for a footing, a wall over 4 feet or a covered patio go to the City of Villa Park building division at City Hall on Santiago Boulevard.
Most Villa Park streets have no curb, no gutter and no public sidewalk, so a driveway meets the asphalt edge directly and the apron has to be built to take the drop. We form it 6 inches thick with a thickened edge at the street and slope it so the winter run-off crosses the drive and carries on down the road as it always has. Where the street does have a curb, on the newer cul-de-sacs, the approach is a Public Works matter and we file for the encroachment before we cut.
The north of the city rises toward Santiago Canyon and the lots there step, so a pool deck or a patio on the hill side often needs a low wall to hold the yard flat first. Water comes from the Serrano Water District, and the old citrus irrigation lines still cross some of these lots, so we locate them before we trench. Summers here run past 95 degrees for weeks, and from June to September we batch for a 6 in the morning pour and finish before the sun is on the slab.