Our yard is in Fullerton and the crew comes down the 605 to Carson Street, so the run is about half an hour with the mixer following. Plans go to the City of Hawaiian Gardens permit counter at City Hall on Pioneer Boulevard, which is a short walk from most of the city. Work in the parkway, the approach or the public walk needs an encroachment permit as well, and we file that with the same city. Both are filed before the saw comes off the truck.
The city is the streets between Carson Street and the county line at Coyote Creek, with Norwalk Boulevard and Pioneer Boulevard running through it, and a refreshment stand roofed in palm fronds on Carson Street gave it the name in the 1920s. The houses came in the 1950s and 1960s on lots of 5,000 square feet and less, most with the drive running down one side to a garage at the back, and the second unit many now have back there is why the drive is the busiest concrete on the lot.
The ground is the flat floodplain of the San Gabriel River and Coyote Creek, sand and silt that drains well in most yards and stays wet in the low ones after a storm. It is not ground that heaves, so a slab that has failed here failed for its water or its thinness, and the cure is the fall and the base, not a thicker section. The calendar is the wettest weeks of winter and the parking, since a curing drive puts your cars on a street where the spaces are already taken.